NPV Scheduler 4 is a software professional planning system for the production of open pit mines and optimization of growing pit development projects (open pit mines).

The software features features that cover everything from pit optimization to back-up design, slice optimization, scheduling, transport optimization, and even storage management.

This extraction software is designed to be fitted with Peak with the highest NPV.

NPV Scheduler has functionalities spanning everything from pit optimization, pushback generation, cut-off grade optimization, scheduling, haulage optimization and stockpile management.

The advanced system caters for alternative techniques beyond NPV for pit optimization to take into account material blending requirements or to maximize life.

The innovative pushback generator delivers the most practical pushbacks of any competing product, and scheduling capability includes optimization techniques that look ahead to the entire life of mine, as opposed to considering just one period at a time.

Here are some key features of “Datamine NPV Scheduler v4.30.55.0”:

  • Determine Pushback Shapes (Pushbacks based on LG phases, but this software also optimizes them to match the mine).
  • Full Mine Project Modeling and Reporting.
  • Mine Execution. Flow Optimiser (MFO) for quicker extraction of ores to reduce costs and increase storage relative to scheduled
  • Planning extraction with goals such as maximizing mine life
  • Identifying extraction phases and optimal phase sequences
  • Generating and optimizing catalysts
  • Providing optimal agricultural model for open pit mining

System Requirement

  • OS :Windows 7, 8, 8.1 AND 10
  • 2GB of RAM or higher

Download Datamine NPV Scheduler v4.30.55.0

Download Here

DOWNLOAD